Turn an unfinished basement into comfortable, dry living space — family rooms, home gyms, offices, in-law suites, and play rooms built to last.
Licensed Hands-On General Contractor · CSL #CS-114214 · HIC #206818
A finished basement is usually the cheapest square footage you can add to your home — but only if it's done right. Done wrong, it's a damp, mold-prone room nobody uses. We start every basement project with a moisture assessment and a framing plan that accounts for vapor, drainage, and insulation before any drywall goes up. From there we handle framing, electrical, HVAC modifications, plumbing for bathrooms or wet bars, drywall, flooring, trim, and finish carpentry. The result is a room that looks and feels like the rest of your house.
Submit photos of your space and we'll respond within 24–48 hours.
Before quoting, we inspect for active water, efflorescence, and humidity issues.
We finalize layout, pull building permits, and coordinate any electrical or plumbing permits.
Walls framed, electrical and plumbing run, inspections passed.
Insulation, vapor barriers, drywall hung and finished to a smooth professional standard.
Flooring, trim, doors, paint, and any built-ins. Final walkthrough.
Todd Home Services has served homeowners across SE Massachusetts since 2017, including Mansfield, Foxboro, Sharon, Norton, Easton, Attleboro, Norfolk, Wrentham, Plainville, Walpole, Brookline, Chestnut Hill, and the surrounding SE Massachusetts towns.
Most finished basements in SE Massachusetts run $35,000–$85,000 depending on square footage, whether you're adding a bathroom, and finish level. We provide a do-not-exceed estimate so you know the ceiling up front.
Yes — every Massachusetts town requires a building permit for finished basements, plus electrical and plumbing permits if applicable. We pull all permits and coordinate inspections.
Before any framing goes up, we assess the foundation, address any active water issues, and install proper vapor management. A finished basement only lasts if the moisture story is handled first.
Yes. We add half baths, full baths with shower or tub, and legal bedrooms (with proper egress windows where required by code).
A typical full basement finish takes 6–10 weeks. Adding plumbing or a bathroom extends the timeline by 1–2 weeks.
Share your project details and photos — we'll send a free estimate within 24–48 hours.